We use cookies to ensure that we give you the best possible experience on our website - read more or close this message

Latest News

Premier Marina News

Dredging Operations Underway

Date:

Port Solent's annual dredging operations are underway with the intention of removing 6000 cubic metres of silt.

New lock pontoons installed

Date:

Premier has completed the installation of the new south side lock pontoon in partnership with Walcon Marine.

New Floating Pontoons Installed in the Lock

Date:

Premier would like to inform berth holders that the lock will be shut for two days in April in order to replace the south side lock pontoon.

Premier Marinas WiFi Coverage now at Optimum Strength (All marinas but Noss)

Date:

Premier has invested in improving the WiFi at its marinas to give berth holders and visitors with the best possible service. Premier’s WiFi offers extensive coverage on the water; the coverage areas are available to view online along with access points for each individual marina.

New Lockmaster Starts at Port Solent Marina

Date:

Premier Port Solent welcomes Jamie Savill to the marina team as the new Lockmaster, replacing Josh McCarthney who has moved into a sales role in Head Office.